Navy PFA · iOS and Android

Score your Navy PRT in seconds.

Know your score and exactly what you need for the next category.

Score push-ups, the forearm plank and every cardio option, check your CFT and body composition, and track your progress between cycles.

Download Navy PFA: PRT & BCA Calculator on the App StoreGet Navy PFA: PRT & BCA Calculator on Google Play

Free to start on iPhone and Android.

Navy PFA calculator scoring an 85 PRT in front of a dashboard showing progress across tests

See it in action

A score for every event, the gap to the next tier, bike calories, your CFT, body composition and the scoring tables.

Why use it

What you get
SCORE

Know your score

Enter your push-ups, forearm plank and cardio and get points per event, your overall score and category, and a pass or fail.

NEXT

See what the next tier takes

Every event shows how many more reps, seconds or calories you need for the next points tier, so you know what to train.

TREND

See how your performance changes over time

Every test you save is added to your history, so you can see which events are improving between cycles. Progress charts are part of Pro.

How the PRT is scored

The Physical Readiness Test (PRT) has three events: push-ups, the forearm plank and cardio. Each is scored by sex and age group on a 100-point scale, and your overall score is the average of the three, rounded down to a multiple of 5. That puts you in a category from Probationary to Outstanding.

You need at least 45 points in every event to pass. SEAL, EOD, SWCC and Fleet Diver Sailors need 70 in every event. Tests above 5,000 feet use the altitude tables, and a medically waived event is handled for you. The High-Performance exemption needs an overall 90 or more with 80 or more in every event, and the full criteria are in the app's Standards tab.

Every cardio option

Pick the 1.5-mile run, treadmill, 2000 m row, 500 yd or 450 m swim, or 12-minute stationary bike. For the bike, choose your machine from the approved Cybex, Life Fitness and Matrix models, enter your weight, and the app shows your points and the calories you need for the next tier. The elliptical is no longer an authorized cardio event.

BCA and the CFT

Body Composition Assessment (BCA) Step 1 is the waist-to-height ratio, and 0.5499 or less passes. If it does not, Step 2 checks body fat, with a limit of 26% for men and 36% for women. The app rounds your height and waist the way the guide does.

The Combat Fitness Test (CFT) for SEAL, SWCC, EOD and Fleet Diver Sailors is an 800 m swim with fins, push-ups and pull-ups with a 20 lb vest, and a 1-mile run with the vest. Every event has to meet its standard, and the app checks each one.

Free, with an optional subscription

The app is free to start and keeps your five most recent results of each test. Navy PFA Pro adds unlimited history, progress charts, and backup and sync across devices. If you used the old Navy PFA app, your PRT and BCA history is kept, and a Pro upgrade you bought there carries over.

Your scores stay on your phone unless you turn on sync. Looking for another service? See our military fitness test apps.

Common questions

Is this an official Navy app?
No. It is not affiliated with or endorsed by the U.S. Navy or the Department of Defense. It scores against the published standards for training, and your official score is the one recorded in PRIMS.
Does it use the forearm plank?
Yes. The plank replaced the curl-up, and the app scores it with push-ups and your cardio event under OPNAVINST 6110.1L.
Which cardio events does it score?
The 1.5-mile run, treadmill, 2000 m row, 500 yd or 450 m swim, and 12-minute stationary bike, with calorie targets for the approved bikes.
How is BCA checked?
Step 1 is the waist-to-height ratio, and 0.5499 or less passes. If you need Step 2, the app calculates body fat against the 26% limit for men and 36% for women.
Does it include the Combat Fitness Test?
Yes. SEAL, SWCC, EOD and Fleet Diver Sailors can check each CFT event against the standard for their group and age.
Is it free?
It is free to start, with your five most recent results of each test. Navy PFA Pro is a monthly or yearly subscription that adds unlimited history, progress charts, and backup and sync across devices.

Sources and standards

Standards reviewed October 13, 2026. This app is not an official Navy product. Scores are for training, and your official score is the one recorded in PRIMS.

Know your PRT score before the PFA

Free to start on iPhone and Android.

Download Navy PFA: PRT & BCA Calculator on the App StoreGet Navy PFA: PRT & BCA Calculator on Google Play